How We Do It
Every project has different requirements and different results. However,
the process of developing custom software tends to follow a few well-defined steps.
Larger projects are almost always broken down into smaller business modules, each
one of which will follow the development sequence independently. Smaller projects
on the other hand, will typically follow these steps more or less in sequence. Even
though they are treated as discrete steps, often the steps themselves will overlap.
All of the steps are equally important.
One of the hallmarks of a quality development effort is that the
proper amount of time is spent on the "non-coding" steps. Unfortunately, under tight
deadlines, many inexperienced developers will frequently jump right into writing
code, without giving proper consideration to gathering requirements, design, and
sometimes even testing.
It is important to understand how the different steps / phases fit
together, and what the roles of the client and the consultant typically are. While
every phase of development requires the involvement of both client and consultant
to some degree, establishing requirements requires the greatest participation by
the client, while the development phase typically involves the least.
At Webtech Softwares we combine traditional object-oriented design,
iterative rapid application development, and thorough deployment methodologies to
deliver highly effective, reusable, and maintainable software applications. We follow
a systematic and step-by-step methodology for all our solution and software development.
In our development methodology we first follow our clients' defined processes and
methods, and then incorporate our own internal process steps wherever they are appropriate.
The main objectives of following a methodology is to make the development
cycle as efficient as possible, to complete development within the lowest possible
cost, keep the highest quality, and achieve the fastest turn-around. Another important
objective is to make future maintenance easier and faster.
Top
The Software Development Process
Software development is the translation of a user need or marketing goal into a
software product. There are several different approaches to software development.
Some take a more structured, engineering-based approach to developing business solutions,
whereas others may take a more incremental approach, where software evolves as it
is developed piece-by-piece. Most methodologies share some combination of the stages
of software development
1. Planning/Initial Planning/Domain Analysis
Often the first step in attempting to design a new piece of software, whether it
is an addition to existing software, a new application, a new subsystem or a whole
new system, is, what is generally referred to as "Domain Analysis". Assuming that
the developers (including the analysts) are not sufficiently knowledgeable in the
subject area of the new software, the first task is to investigate the so-called
"domain" of the software. The more knowledgeable they are about the domain already,
the less work required. Another objective of this work is to make the analysts,
who will later try to elicit and gather the requirements from the area experts,
speak with them in the domain's own terminology, facilitating a better understanding
of what is being said by these experts. If the analyst does not use the proper terminology
it is likely that they will not be taken seriously, thus this phase is an important
prelude to extracting and gathering the requirements.
2. Requirement Analysis/Specification Analysis
The starting point in establishing requirements is a careful analysis of the existing
process which is to be automated. By examining the existing process, we can fit
the design to the way your business actually operates. Of course, this examination
also opens the possibility of modifying the business process to take advantage of
the way computers handle information. For example, you would only need to enter
data once, even though in a manual process it may need to be copied several times.
The key here is to remain flexible, and look for opportunities to streamline certain
tasks, without forcing you into any specific procedures.
In this phase, both consultant and client discuss the system to be developed. We
determine the minimal set of features to be supported (the "needs"), as well as
the ideal system desired (the "wants"). The reason it's important to establish these
priorities is that many projects are constrained by time; the client has specific
needs that must be met within a specific time frame. This is often one motivation
for breaking a large project into multiple development cycles. High priority, mission-critical
features can be implemented in earlier phases, while desired but less essential
features can be added in a later phase. Consequently, once the requirements have
been established and prioritized, an initial timetable is determined.
One of the most powerful tools used in establishing requirements, particularly user
interface requirements, is prototyping. What that means is that the consultant will
create a dummy application that looks like the final product, but without any of
the business logic built in. This prototype is easy to build, and can usually be
done in a few days, even for larger systems. Its purpose is to allow the user to
see what the final product will actually look like, and get a sense of how much
data will fit on one window, how that data is organized, what steps are required
to perform specific tasks, and so on. What that means is that usability issues are
addressed early in the development process, while they're still easy to correct.
3. Software Architecture - Design & Specification
One of the most important steps, even though it's frequently ignored. It actually
consists of two steps.
The first is to establish a high-level design that specifies what the different
parts of the system will be, and how they interrelate. During this phase, decisions
are made regarding what hardware and operating systems are required, as well as
what software tools will be used. User interface standards are established based
on the prototype discussed above, so that every window has a consistent 'look-and-feel'
in its presentation, and is consequently easier to use.
The second part is a detailed specification of each business module, window,
and function within the system. A detailed database design, or schema, is also established
at this point. As with prototyping, performing a detailed design allows changes
to be made early, while it's still relatively easy. Done properly, this serves as
the foundation for the technical documentation of the system. It also serves as
a blueprint to guide the development phase. At this point, a firm timetable can
usually be established.
Note the distinctions between requirements gathering, analysis and design. A requirement
gathering refers to the task of identifying the business problem or need at hand.
Analysis refers to the task of understanding the business problem at hand. Design,
on the other hand, refers to the process of planning the solution to that problem.
4. Development & Implementation
This is the part of the process where software engineers actually program the code
for the project. This phase usually comprises the majority of the project life cycle.
Taking the design established in the previous phase, the application itself is then
built. Often the system is built in multiple phases so that critical functionality
can be deployed as early as possible.
5. Testing & Integration
Testing software is an integral and important part of the software development process.
This part of the process ensures that bugs are recognized as early as possible.
Even though it's listed as a separate phase, the bulk of the testing actually occurs
during the development & implementation phase. This first part is commonly known
as “unit testing”. Its goal is to make sure that the individual components of the
system work well, both separately and in conjunction with other parts of the system.
If done poorly, the user will later experience problems such as system crashes,
or poor performance. Done well, the user may not even be aware of this form of testing
at all.
The other type of testing is known as “system testing”. Its goal is to make sure
that the original requirements have been met, that the business rules embodied in
the system are correct, and to verify that the system works as a coherent whole.
This stage of testing is done in close coordination with the eventual users of the
system. This is another reason why it's important to have the participation of the
end users in gathering requirements. Often, a new application will replace an existing
one; in such a case, testing often includes running both systems in parallel for
a defined period of time.
6. Documentation
This is probably the most frequently forgotten step. Documenting the internal design
of software for the purpose of future maintenance and enhancement is done throughout
development. This may also include the authoring of an API, be it external or internal.
Documentation serves two purposes.
While one of the goals of effective user interface design is to minimize the need
for user documentation by making the system easy and intuitive to use, proper documentation
is nonetheless important in training both current and new staff in the use of the
system. User documentation is the guide to using the system, as well as making the
most of its features. User documentation may come in different forms, from printed
manuals to online help files.
Technical documentation, on the other hand, is used as a guide for future
developers to make changes to a system months or even years later. Even the developer
who designed and wrote most of a system would be hard-pressed to remember every
detail of its implementation after a period of time.
7. Release/Deployment
This is where it all comes together. Hardware is installed, and the network configuration
is established. Depending on the design of the system, database, application, and
web servers are installed on dedicated server machines. Existing data, if any, is
converted to the new system. The finished application is then installed, and final
testing is done to make sure that all of the pieces of the system are working correctly
in concert with one another.
8. Training & Support
A large percentage of software projects fail because the developers fail to realize
that it doesn't matter how much time and planning a development team puts into creating
software if nobody in an organization ends up using it. People are often resistant
to change and avoid venturing into an unfamiliar area, so as a part of the deployment
phase, it is very important to have training classes for new clients of your software.
Maintaining and enhancing software to cope with newly discovered
problems or new requirements can take far more time than the initial development
of the software. It may be necessary to add code that does not fit the original
design to correct an unforeseen problem or it may be that a customer is requesting
more functionality and code can be added to accommodate their requests. It is during
this phase that customer calls come in and you see whether your testing was extensive
enough to uncover the problems before customers do.
|
|